Kenmare Resources plc (“Kenmare” or “the Company”)
29 April 2016
Publication of 2015 Annual Report
Kenmare Resources plc (LSE:KMR, ISE:KMR), one of the leading global producers of titanium minerals and zircon, which operates the
Overview
- Power outage of 57 days in Q1 2015 significantly impacted production for the year
- Production of Heavy Mineral Concentrate (“HMC”) down 15% to 1,100,600 tonnes (2014: 1,287,300 tonnes)
- Production of ilmenite down 11% to 763,500 tonnes (2014: 854,600 tonnes), production of zircon up 2% to 51,800 tonnes (2014: 50,800 tonnes)
- Shipments of finished product flat at 800,400 tonnes (2014: 800,000 tonnes)
- Revenues of
US$142.6m (2014:US$174.3m ) - EBITDA of
US$11.5m negative (2014:US$9.4m positive) - Cash flow from operating activities of
US$3.0m (2014:US$18.8m negative) - Loss after tax of
US$60.6m (2014:US$100.8m ) - Total cash cost per tonne of finished product decreased 13% from 2014 to 2015 and decreased by 27% between H1 2015 and H2 2015
- Proposed capital raising and debt restructuring, announced separately, would provide a robust balance sheet and significantly reduce financial gearing
Statement from
“Kenmare’s balance sheet has been over reliant on debt for this stage of the commodity cycle, which has been of unprecedented duration and depth. The cost of debt service and the risk it poses to the Company intensified the decline in our share price during 2015.
Kenmare has proposed a radical deleveraging plan which will create a robust balance sheet and allow the Company to benefit from the expected recovery in titanium feedstock prices and sales volume growth. Kenmare, as the largest supplier of traded ilmenite in the world and with a good competitive position on the cost curve, will benefit from this recovery.
We are very grateful for the support of the cornerstone investors, whose expected long term investment in Kenmare is positive for all stakeholders and we look forward to launching the capital raise in the near future.”
Annual Report
A copy of the Annual Report has been submitted to the Irish Stock Exchange and the
Company Announcements Office,
Irish Stock Exchange,
Tel: + 353 1 6174200
and
http://www.morningstar.co.uk/uk/NSM
Results conference call
A conference call for analysts will be held at 9:30am GMT on 29 April 2016. Participant dial-in numbers are as follows:
| | 08082 370 030 or 020 31 394 830 |
| | 01 696 8154 or 1800 936 842 |
| Rest of the world: | +44 (0) 203 139 4830 |
| Participant ID# | 49796939# |
For further information, please contact:
Kenmare Resources plc
Tel: +353 1 671 0411
Mob: + 353 87 674 0110
Tel: +353 1 671 0411
Mob: + 353 87 674 0346
Tel: +353 1 671 0411
Mob: + 353 87 943 0367
Murray Consultants
Joe Heron
Tel: +353 1 498 0300
Mob: +353 87 690 9735
Buchanan
Tel: +44 207 466 5000
CHAIRMAN’S STATEMENT
Dear Shareholder,
Market Environment
The mining industry in 2015 continued to suffer from the profound cyclical downturn in all commodity markets. Mineral sands producers suffered further price reductions from already depressed levels. Weighted average FOB prices for Kenmare’s products declined 16% in 2015 compared to 2014.
However, global supply of ilmenite reduced significantly through the year, as higher cost producers progressively shut down. In particular, ilmenite supply as a by-product of iron ore mining in
Operations
Exceptional flood events in northern
As we have commented on in previous annual reports, power stability has been a root limitation on mining activities in recent years. We are now pleased to report that, after repairs and reinforcements to the grid, and separately, completion of planned power line infrastructure upgrades by EdM, transmission capacity on the line to Moma has increased and stability is much improved. Despite the challenges presented through 2015, in Q3 the Mine produced at an annualised run rate of a million tonnes per annum of ilmenite, highlighting the operational improvement evident when the Mine has a stable power supply.
Comprehensive and ongoing efforts by the Moma site team has resulted in a reduction in absolute operating costs of 21% in 2015 compared to 2014, while maintaining operational integrity and HSE standards. Unfortunately but inevitably, this required a retrenchment in numbers and a reduction in employee allowances for the remaining staff.
I would like to express my sincere appreciation for the efforts everyone in the Group has made to adjust costs sufficiently to ensure the survival of the Mine despite dire market conditions. These changes have not only allowed us to stay in business, but to provide a platform for success as the market improves. Unfortunately, advisor fees incurred relating to the debt restructuring and approach by Iluka Resources Limited (“Iluka”) have been very significant.
We expect that further cost reductions, in combination with higher production as a result of increased power stability, should continue to positively impact performance through 2016.
Financial Results
Kenmare’s financial results improved significantly in the second half of the year as production increased and cost reduction initiatives bore fruit. Total cash operating cost per tonne of finished product decreased by 27% between H1 and H2 2015, though only decreased 13% compared to financial year 2014, as a result of the lower production in the first half of the year.
Kenmare generated earnings before interest, tax, depreciation and amortisation (“EBITDA”) of negative
Approach by Iluka Resources Limited
Kenmare was approached in June 2014 by Iluka with a preliminary conditional proposal to acquire Kenmare via a scheme of arrangement. Kenmare engaged in extensive good faith discussions with Iluka, with the objective of obtaining a firm offer that could be put to shareholders as a whole. However, after a number of revisions by Iluka to its conditional proposal, Iluka withdrew from making an offer on 7 December 2015.
Financing
Significant loan amendments were agreed with our Lenders on 29 April 2015 (the “April 2015 Amendment”), which provided inter alia: a “new money commitment” of up to
A material deleveraging plan was delivered to Lenders on 28 January 2016. While we are working closely and constructively with Lenders towards the implementation of a deleveraging plan, formal notification of approval from the Lenders has yet to be obtained. Consequently, events of default continue to exist, though none have been declared by the Lenders.
Proposed Recapitalisation of Kenmare
On 7 December 2015, Kenmare announced a proposed recapitalisation and restructuring of the balance sheet, including an investment of
This capital raising envisages at least
This recapitalisation plan is of course not guaranteed at the time of writing this Annual Report, and is subject to the usual financial market uncertainties over the coming weeks and months prior to execution. However, assuming successful execution of this plan, we firmly believe the recapitalisation will be in the best interest of all stakeholders, despite the dilution of current shareholders’ ownership in Kenmare. The balance sheet will then be much stronger and the Company well positioned to exploit the eventual recovery in the product market.
Board & Corporate Governance
The Kenmare Board has benefited from the appointment of
Conclusion
We believe that the mineral sands business has now passed its cyclical low and is beginning to rebound. We cannot be sure how strong or how quickly the product markets will recover, but Kenmare is highly geared to any upturn and benefits from long life resources. Kenmare benefits from the production of specific ilmenite products with significantly improving demand characteristics as new smelter capacity comes on stream.
On behalf of the Board, I would like to express appreciation for the hard work and dedication of Kenmare’s staff during an exceptionally difficult year. Major cost and headcount reduction programmes have been designed and executed with sensitivity and without compromise of HSE or other standards.
Finally, as Chairman, I would like to sincerely thank the whole Board for their immense and effective efforts on behalf of the Company in exceptionally difficult circumstances during 2015, which has required a major increase in the time demanded of each Board member. We are now able to cautiously look forward to a more stable and sustainable future with the planned execution of the recapitalisation plan during 2016.
Chairman
MANAGING DIRECTOR’S REVIEW
Kenmare’s balance sheet has been over reliant on debt for this stage of the commodity cycle, which has been of unprecedented duration and depth. The cost of debt service and the risk it poses to the Company intensified the decline in our share price during 2015.
In response, Kenmare has proposed a radical deleveraging plan which will create a robust balance sheet and allow the Company to benefit from the expected recovery in titanium feedstock prices and sales volume growth.
Recapitalisation
The planned recapitalisation is expected to consist of two investments of
In the meantime, Kenmare has entered an ilmenite off-take agreement for 2016 with a long established customer. This customer has prepaid, in 2016, for certain deliveries of ilmenite which will occur later in the year. These funds have provided Kenmare bridging financing to allow the recapitalisation to be delivered.
Safety and Risk
Total injuries, measured using the All Injury Frequency Rate (“AIFR”), continued to fall, from2.46 in 2014, to 1.87 in 2015, representing a 24% reduction and an absolute reduction from 36 injuries in 2014 to 23 in 2015. Nine lost time injuries occurred in 2015, with the Lost Time Injury Frequency Rate (“LTIFR”) reaching 0.47, a deterioration in performance from 2014 (0.37). Kenmare has responded swiftly with a renewed focus on safety practices and behaviours.
High environmental standards were maintained, with effective community and educational programmes continuing in the local area, and the process of further localisation of the workforce moved forward. During the flooding crisis in the region in early 2015, Moma and its airstrip was used as a base for major humanitarian relief and aid efforts, in which Kenmare participated.
Power Supply
The greatest obstacle to maximising production in recent years has been weakness in electricity supply from EdM. Kenmare has improved power quality at Moma by installing a synchronous condenser (“Dip Doctor”) and hiring diesel generators, but these mine site improvements cannot fully compensate for power outages or the breach of grid transmission capacity limits.
Extreme weather events in Q1 2015 brought down sections of the EdM transmission network, and northern
Generation capacity in northern
We have already seen considerable improvement in power quality and reliability in the first few months of 2016 and as these improvements settle down, we believe power will no longer be a fundamental constraint on Moma’s ability to produce.
Mining
Severe and exceptional storms in 2015 resulted in the mining operation being without power for 57 days. Repairs have been completed and flood defences have been installed along the transmission lines, so that if similar events occur again they should not have such a significant effect on operations. Due principally to the downtime caused by the power interruption, ore mined in 2015 declined by 19% from the previous year to 27.5 million tonnes. However, because of an increase in grade, HMC produced declined by 15% to 1,100,600 tonnes. Mining output is expected to benefit from a significantly more stable power supply, with HMC also benefitting from an increase in grade from the latter part of Q2 2016 onwards. A focused programme of organisational and management improvements has also been put in place with the aim of reducing downtime and ensuring steady production.
Mineral Processing
The mineral separation plant (“MSP”) was constrained by the availability of HMC in the first half of the year, caused by storm-related power outages. These outages were initially mitigated by bringing forward maintenance and using the diesel generators to continue operating the MSP to process stockpiled HMC. However, due to the length of the outage, HMC stockpiles ran out, resulting in reduced finished product production.
Due to the constraints on HMC production, the output of ilmenite fell 11% year on year. Total ilmenite production at 763,500 tonnes in 2015 was lower than the anticipated range of 900,000 to 1,000,000 tonnes.
Zircon production for the full year was 51,800 tonnes, which represented a 2% increase on 2014, despite the lower tonnage of HMC available for processing. There was an improvement in recovery rates for zircon as improvement projects were implemented to recover additional secondary zircon product. Primary and secondary zircon production is expected to rise in 2016, with higher HMC production.
Operating cost
The Company has been very focused on reducing our operating costs. A retrenchment programme introduced in February 2015 reduced the number of employees on site by 162, while a reduction in the shift allowance for the remaining shift workers has resulted in a significant labour cost saving. All other aspects of the business, from electricity usage to supplier contracts, have been revisited to lower costs. This has resulted in an absolute cash cost reduction of 21% in 2015, down to
Supply/Demand Balance
During 2015 15% of Kenmare’s ilmenite was sold to
Demand for titanium dioxide feedstocks was adversely hit by a sudden and acute mid-year 2015 slowdown in
The reduction in the value of iron ore has had an inhibiting effect on the mining of titano-magnetite ores in
In similar vein, a titano-magnetite mine in
Our assessment of global supply and demand shows that production of sulphatable ilmenite is in deficit and inventory is being consumed. This is most evident in the trend in Chinese port stocks which have almost halved from a peak in March 2015 to the lowest levels recorded in the last three years.
The zircon market is controlled by a small number of major suppliers who generally operate in a disciplined fashion. Unfortunately, competition between producers for increased market share has resulted in some value destruction. Kenmare expects that the logic of disciplined behaviour will prevail and that over time zircon prices will revert to previous levels.
Outlook
The outlook for Kenmare depends on the successful implementation of the recapitalisation as outlined above.
This will produce a Company with a robust balance sheet, low levels of debt with a repayment holiday for the next two years, a reasonable interest rate, and new strategic shareholders joining the shareholder register. The expansion has been bedded down, costs have been substantially reduced, electricity supply, the thorn in the Company’s side for the last several years, has been dramatically improved and many management system improvements have been made.
We are very grateful for the support of the cornerstone investors, whose expected long term investment in Kenmare is positive for all stakeholders and we look forward to launching the capital raise in the near future.
The market for sulphate ilmenite (our largest product) is in supply deficit and inventories appear to be declining. The production of Chinese domestic ilmenite continues to reduce and many projects around the world have either been closed through depletion or because they need vastly better economics to justify their operation. Recovery of the real estate market in
Keeping Kenmare in business during this downturn has taken huge efforts by the staff and the Board. I would like to thank them all for their efforts.
Managing Director
KENMARE RESOURCES PLC
CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME
FOR THE FINANCIAL YEAR ENDED 31 DECEMBER 2015
| Notes | 2015 | 2014 | |
| US$’000 | US$’000 | ||
| Revenue | 3 | 142,583 | 174,317 |
| Cost of sales | (168,138) | (173,366) | |
| Gross (loss)/profit | (25,555) | 951 | |
| Other operating costs | 5 | (21,780) | (32,415) |
| Impairment loss | 13 | – | (64,762) |
| Operating loss | | (47,335) | (96,226) |
| Finance income | 8 | 543 | 6,314 |
| Finance costs | 9 | (37,805) | (34,852) |
| Foreign exchange gain | 22,658 | 24,113 | |
| Loss before tax | (61,939) | (100,651) | |
| Income tax credit/(charge) | 10 | 1,320 | (143) |
| Loss for the financial year | |||
| and total comprehensive income for the financial year | (60,619) | (100,794) | |
| Attributable to equity holders | (60,619) | (100,794) | |
| Cent per share | Cent per share | ||
| Loss per share: Basic | 11 | (2.18) | (3.62) |
| Loss per share: Diluted | 11 | (2.18) | (3.62) |
The accompanying notes form part of these financial statements.
KENMARE RESOURCES PLC
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 31 DECEMBER 2015
| Notes | 2015 | 2014 | |
| US$’000 | US$’000 | ||
| Assets | |||
| Non-current assets | |||
| Property, plant and equipment | 13 | 834,961 | 865,217 |
| Deferred tax asset | 14 | 1,320 | – |
| Other receivables | 17 | 649 | 1,021 |
| 836,930 | 866,238 | ||
| Current assets | |||
| Inventories | 15 | 46,228 | 62,452 |
| Trade and other receivables | 17 | 20,268 | 27,118 |
| Cash and cash equivalents | 18 | 14,352 | 21,795 |
| 80,848 | 111,365 | ||
| Total assets | 917,778 | 977,603 | |
| Equity | |||
| Capital and reserves attributable to the | |||
| Company’s equity holders | |||
| Called-up share capital | 19 | 214,941 | 225,523 |
| Share premium | 20 | 431,380 | 431,380 |
| Retained losses | 21 | (175,651) | (115,032) |
| Other reserves | 22 | 32,804 | 22,896 |
| Total equity | 503,474 | 564,767 | |
| Liabilities | |||
| Non-current liabilities | |||
| Bank loans | 23 | – | 261,634 |
| Obligations under finance lease | 24 | 264 | 743 |
| Provisions | 25 | 22,100 | 21,624 |
| 22,364 | 284,001 | ||
| Current liabilities | |||
| Bank loans | 23 | 341,943 | 76,040 |
| Obligations under finance lease | 24 | 479 | 415 |
| Provisions | 25 | 1,714 | 2,387 |
| Other financial liabilities | 26 | 22 | 520 |
| Trade and other payables | 27 | 47,782 | 49,473 |
| 391,940 | 128,835 | ||
| Total liabilities | 414,304 | 412,836 | |
| Total equity and liabilities | 917,778 | 977,603 |
The accompanying notes form part of these financial statements.
On behalf of the Board:
M. Carvill Director
29 April 2016
KENMARE RESOURCES PLC
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE FINANCIAL YEAR ENDED 31 DECEMBER 2015
| Notes | 2015 | 2014 | |
| US$’000 | US$’000 | ||
| Operating activities | |||
| Loss for the financial year before tax | (61,939) | (100,651) | |
| Adjustment for: | |||
| Foreign exchange movement | (22,658) | (24,113) | |
| Share-based payments | 5 | (674) | 1,349 |
| Finance income | 8 | (45) | (184) |
| Finance costs | 9 | 37,805 | 34,852 |
| Depreciation | 6 | 35,820 | 40,850 |
| Impairment loss | 13 | – | 64,762 |
| Decrease in other financial liabilities | 26 | (498) | (5,331) |
| (Decrease)/increase in provisions | 25 | (742) | 528 |
| Operating cash flow | (12,931) | 12,062 | |
| Decrease/(increase) in inventories | 15 | 16,224 | (18,256) |
| Decrease/(increase) in trade and other receivables | 17 | 7,222 | (7,532) |
| (Decrease)/increase in trade and other payables | 27 | (1,901) | 1,780 |
| Cash from/(used in) operations | 8,614 | (11,946) | |
| Interest received | 8 | 45 | 184 |
| Interest paid | 23 | (5,700) | (7,046) |
| Net cash from/(used in) operating activities | 2,959 | (18,808) | |
| Investing activities | |||
| Additions to property, plant and equipment | 13 | (5,564) | (5,187) |
| Net cash used in investing activities | (5,564) | (5,187) | |
| Financing activities | |||
| Repayment of borrowings | 23 | – | (13,001) |
| Decrease in borrowings | 23 | (7,330) | (8,268) |
| Payment of obligations under finance leases | 24 | (560) | (560) |
| Net cash used in financing activities | (7,890) | (21,829) | |
| Net decrease in cash and cash equivalents | (10,495) | (45,824) | |
| Cash and cash equivalents at the beginning of the financial year | 21,795 | 67,546 | |
| Effect of exchange rate changes on cash and cash equivalents | 3,052 | 73 | |
| Cash and cash equivalents at the end of the financial year | 18 | 14,352 | 21,795 |
Detailed notes to the Financial Statements for the year ended 31 December 2015 are available in the 2015 Annual Report and Accounts.
This announcement contains some “forward-looking statements” that represent Kenmare’s expectations for its business, based on current expectations about future events, which by their nature involve risks and uncertainties. Kenmare believes that its expectations and assumptions with respect to these forward-looking statements are reasonable. However, because they involve risk and uncertainty, which are in some cases beyond Kenmare’s control, actual results or performance may differ materially from those expressed or implied by such forward-looking information.